Bansagar MVRWSS Dist- Shahdol (MP)
Project Cost :- 3.10 Cr
Execution of HDPE & DI pipe laying work for Drinking water project. HDPE pipe dia from 90 mm to 250 mm dia and DI K9/K7 from 100 mm dia to 600 dia including Supporting structure, Thrust block, chamber and CC road breaking and restoration work. Total Pipe laying qty- 205.00 KM.
MALTHON MVRWSS, Dist.- SAGAR (M.P)
Project Cost :- 8.50 Cr.
Construction Work of 31 MLD Water Treatment Plant.
Waidhan MVRWSS, Dist.-Singrauli (M.P)
Project Cost :- 22 .00 Cr.
Construction of OHMBR 1920 KL, 25 nos OHT from capacity 150 KL to 500 KL OHT, 1200 kilometer pipeline work of DI and HDPE from 63 mm to 900 mm diameter. Along with supporting structure of pipeline work.
Auraiya SWSM, Dist.- Auraiya (UP)
Project Cost :- 8.00 Cr.
Construction of overhead tank, boundary wall and pump house
GULABSAGAR MVRWSS , Dist.- SIDHI (M.P)
Project Cost :- 7.50 Cr.
Execution of HDPE and DI pipeline work